ViewingCEM I 52.5 N-SR 3EN 52.5 N / sulfate-resistant SR 3

CEM I 52.5 N-SR 3 CBCM 42.5 kg cement bag

CEM I 52.5 N-SR 3 EN 52.5 N / sulfate-resistant SR 3

CEM I 52.5 N-SR 3

Sulfate-resistant Portland cement for 52.5 N / SR 3 requirements. A signed test report documents its strength development, chemistry, and SR 3 category.

≈7,780 PSI28-day EN 196-1 result
42.5 kg bagAdd this format to the price request
1.5 MT FIBCAdd this format to the price request
Request pricing for CEM I 52.5 N-SR 3 View product specifications
2 days≈4,260 PSI29.35 MPa
7 days≈6,200 PSI42.75 MPa
28 days≈7,780 PSI53.67 MPa
Full product specifications

What you’re buying

One complete Portland-cement designation with 52.5 N and SR 3.

CEM I identifies Portland cement, 52.5 is the EN strength class, and N identifies normal early strength.

SR 3 is the documented sulfate-resistance category, giving buyers a complete designation for specification and pricing.

01

CEM I

The Portland cement family.

02

52.5

The EN cement strength class.

03

N

Normal early strength.

04

SR 3

The documented sulfate-resistance category.

From specification to price

Price the complete 52.5 N-SR 3 designation.

Add the application, exposure, requested certificates, pack format, quantity, timing, and destination.

  • Full designation or project specification
  • Application, exposure, and performance target
  • Production schedule and strength timing
  • Requested certificates and inspection documents
  • Pack, tonnage, timing, and destination port
CEM I 52.5 N-SR 3 cement at a clean concrete project site

Build the pricing brief

Build the price request around the product, project, and shipment.

Connect the exact cement to the production plan, pack format, tonnage, timing, and destination port.

01

Your specification

Share the standard, complete designation, application, exposure, and requested inspection documents.

02

Your production plan

Add the performance target, production schedule, mix requirements, placement, and curing plan.

03

Your shipment

Choose the pack, tonnage, timing, destination, receiving plan, and requested MTC or COA documents.

Bring the project mix and performance target into the enquiry so the cement and shipment can be priced against one complete commercial brief.

Representative EN 196-1 results

See the matched strength development at 2, 7, and 28 days.

Representative cement-mortar results: ≈4,260 PSI at 2 days, ≈6,200 PSI at 7 days and ≈7,780 PSI at 28 days.

Representative EN 196-1 cement-mortar compressive-strength results
Test ageApprox. PSISource MPa
2 days≈4,260 PSI29.35
7 days≈6,200 PSI42.75
28 days≈7,780 PSI53.67

Representative physical results

The signed physical, chemical, and compound results.

The signed report also covers setting, soundness, fineness, chemistry, and calculated compound data.

Selected representative test results
TestResult
Initial setting time175 min
Final setting time235 min
Soundness1.00 mm
Standard consistency29.00 %
Specific surface · Blaine3,345 cm²/g
Tricalcium silicate · C₃S66.54 %
Dicalcium silicate · C₂S5.02 %
Tricalcium aluminate · C₃A2.80 %
Tetracalcium aluminoferrite · C₄AF14.44 %
C₄AF + 2(C₃A)20.04 %
View all specifications Download PDF Request pricing for CEM I 52.5 N-SR 3

The representative product results pair source MPa with rounded PSI for faster comparison. Add the EN 196-1 cement-mortar profile and project mix target to one complete pricing brief.

How you need it packed

Pick the format built for your operation.

Choose 42.5 kg bags or 1.5 MT FIBCs, then add the unloading plan, storage, tonnage, timing, and destination to build the shipment offer.

Pack format42.5 kg bagRequest pricing for 42.5 kg bagsPack format1.5 MT FIBCRequest pricing for 1.5 MT FIBCs
CEM I 52.5 N-SR 3 42.5 kg bag beside a 1.5 MT FIBC

Same CEM I 52.5 N-SR 3 cement42.5 kg + 1.5 MT

Named-port pricing

FOB / CIF

quoted for your port and order

Price CEM I 52.5 N-SR 3 for your port.

Send the pack, approximate tonnage, timing, and destination. The issued offer confirms origin, availability, freight scope, and lead time.

FOB and CIF: FOB puts ocean-freight control with your team from the named loading port. CIF adds ocean freight and minimum marine insurance to the named destination port. The issued offer itemizes the selected scope.

Request named-port pricing
CEM I 52.5 N-SR 3 cement staged for port handling

FOB / CIF

Control the freight—or ask us to price it to your port.

Choose FOB when your team arranges ocean freight from the loading port. Choose CIF when you want the quote to include ocean freight and minimum marine insurance to the named destination port. The issued offer states the exact scope.

Request named-port pricing
CEM I 52.5 N-SR 3 cement at a clean receiving site

Packing and traceability

Carry the full 52.5 N-SR 3 identity into the shipment brief.

Add the pack format, quantity, requested documents, receiving plan, timing, and destination to the complete product name.

Request named-port pricing

Request named-port pricing

Build your price request around the real shipment.

Send the cement or specification, approximate tonnage, pack, timing, destination, and contact details. CBCM will connect those inputs in a focused FOB or CIF pricing scope.

Your company and contactCement and projectQuantity, pack, and timingDestination and FOB/CIF scope
01 Your company and contact
02 Cement and project
03 Shipment and port

Add an email or phone number for pricing follow-up.