Previous shipment
25,000 metric tonnes · target reached
Shipping information
View the planned Shared Shipping date, check the last shipment and request freight details for your destination.
Freeport. Your port. Your next order.
Where does your business need cement? Choose your destination to request a shipping quote.
Request current freight.
Get a freight quote for your destination, quantity and packing.
Shipment schedule
Shared Shipping starts at 200 metric tonnes. For independent shipments, the minimum order is 2,500 metric tonnes.
25,000 metric tonnes · target reached
Previous shipment
25,000 metric tonnes · target reached
Prepare for delivery
Plan your unloading, inland transport and storage before the cement arrives.
Check the trade term, named port, freight and insurance basis, discharge arrangements, port charges, import costs and inland transport.
Commercial termsTell us how the shipment will be unloaded and stored. Bag slings and 1.5 metric tonne jumbo bags need an appropriate handling plan and equipment.
Packing and handling guidesHave covered storage ready before the cement arrives. Keep bags protected from rain, moisture and direct contact with damp floors, and plan your stock rotation.
Cement storage guidesTell us your product, quantity and destination. We’ll price your shipment.