ViewingCEM II/A-M (P-L) 42.5 REN 42.5 R / Portland-composite cement

CEM II/A-M (P-L) 42.5 R CBCM 42.5 kg cement bag

CEM II/A-M (P-L) 42.5 R EN 42.5 R / Portland-composite cement

CEM II/A-M (P-L) 42.5 R

For EN 42.5 R specifications requiring Portland-composite cement. Natural pozzolana and limestone, with representative strength results at 2, 7, and 28 days.

≈6,870 PSI28-day EN 196-1 result
42.5 kg bagAdd this format to the price request
1.5 MT FIBCAdd this format to the price request
Request pricing for CEM II/A-M (P-L) 42.5 R View product specifications
2 days≈4,280 PSI29.5 MPa
7 days≈5,900 PSI40.7 MPa
28 days≈6,870 PSI47.4 MPa
Full product specifications

What you’re buying

The full name tells your team why this is the 42.5 R option.

CEM II/A-M identifies a Portland-composite cement. The (P-L) notation identifies natural pozzolana and limestone.

42.5 is the EN cement strength class and R highlights rapid early strength, with 42.5 kg bags and 1.5 MT FIBCs available to request for shipment pricing.

01

CEM II/A-M

The Portland-composite cement family.

02

(P-L)

Natural pozzolana and limestone constituents.

03

42.5

The EN cement strength class.

04

R

Rapid early strength under the EN designation.

From specification to price

Build a named-port price for the full EN designation.

Add the quantity, pack format, requested documents, timing, and Caribbean destination to price the complete order.

  • Full designation or project specification
  • Application, exposure, and performance target
  • Production schedule and strength timing
  • Requested certificates and inspection documents
  • Pack, tonnage, timing, and destination port
CEM II/A-M (P-L) 42.5 R cement at a clean concrete project site

Build the pricing brief

Build the price request around the product, project, and shipment.

Connect the exact cement to the production plan, pack format, tonnage, timing, and destination port.

01

Your specification

Share the standard, complete designation, application, exposure, and requested inspection documents.

02

Your production plan

Add the performance target, production schedule, mix requirements, placement, and curing plan.

03

Your shipment

Choose the pack, tonnage, timing, destination, receiving plan, and requested MTC or COA documents.

Bring the project mix and performance target into the enquiry so the cement and shipment can be priced against one complete commercial brief.

Representative EN 196-1 results

See how the strength develops at 2, 7, and 28 days.

Representative cement-mortar results: ≈4,280 PSI at 2 days, ≈5,900 PSI at 7 days and ≈6,870 PSI at 28 days.

Representative EN 196-1 cement-mortar compressive-strength results
Test ageApprox. PSISource MPa
2 days≈4,280 PSI29.5
7 days≈5,900 PSI40.7
28 days≈6,870 PSI47.4

Representative physical results

The supporting data behind the headline.

The published specifications also cover setting time, soundness, water demand, specific gravity, fineness, sieve residue, and chemistry.

Selected representative test results
TestResult
Initial setting time190 min
Final setting time280 min
Soundness1 mm
Water demand28.1 %
Specific surface · Blaine4,150 cm²/g
45 µm sieve residue4.4 %
View all specifications Download PDF Request pricing for CEM II/A-M (P-L) 42.5 R

The representative product results pair source MPa with rounded PSI for faster comparison. Add the EN 196-1 cement-mortar profile and project mix target to one complete pricing brief.

How you need it packed

Pick the format built for your operation.

Choose 42.5 kg bags or 1.5 MT FIBCs, then add the unloading plan, storage, tonnage, timing, and destination to build the shipment offer.

Pack format42.5 kg bagRequest pricing for 42.5 kg bagsPack format1.5 MT FIBCRequest pricing for 1.5 MT FIBCs
CEM II/A-M (P-L) 42.5 R 42.5 kg bag beside a 1.5 MT FIBC

Same CEM II/A-M (P-L) 42.5 R cement42.5 kg + 1.5 MT

Named-port pricing

FOB / CIF

quoted for your port and order

Price CEM II/A-M (P-L) 42.5 R for your port.

Send the pack, approximate tonnage, timing, and destination. The issued offer confirms origin, availability, freight scope, and lead time.

FOB and CIF: FOB puts ocean-freight control with your team from the named loading port. CIF adds ocean freight and minimum marine insurance to the named destination port. The issued offer itemizes the selected scope.

Request named-port pricing
CEM II/A-M (P-L) 42.5 R cement staged for port handling

FOB / CIF

Control the freight—or ask us to price it to your port.

Choose FOB when your team arranges ocean freight from the loading port. Choose CIF when you want the quote to include ocean freight and minimum marine insurance to the named destination port. The issued offer states the exact scope.

Request named-port pricing
CEM II/A-M (P-L) 42.5 R cement at a clean receiving site

Packing and receiving

Choose the pack that fits your receiving operation.

Request 42.5 kg bags or 1.5 MT FIBCs, then add unloading equipment, storage, tonnage, timing, and destination to the pricing brief.

Request named-port pricing

Request named-port pricing

Build your price request around the real shipment.

Send the cement or specification, approximate tonnage, pack, timing, destination, and contact details. CBCM will connect those inputs in a focused FOB or CIF pricing scope.

Your company and contactCement and projectQuantity, pack, and timingDestination and FOB/CIF scope
01 Your company and contact
02 Cement and project
03 Shipment and port

Add an email or phone number for pricing follow-up.