ViewingCEM II/B-S 52.5 NPortland-slag / EN 52.5 N

CEM II/B-S 52.5 N, 42.5 kg bag

CEM II/B-S 52.5 N · 42.5 kg bags

Portland-slag cement

CEM II/B-S 52.5 N

As low as US$7.95 / 42.5 kg bag

FOB Freeport, Bahamas · cement and bagging · under contract. Freight quoted separately.

1.5 MT jumbo bags · Quote only

Portland-slag cement in the EN 52.5 N class. 42.5 kg bags or 1.5 MT jumbo bags. Shared Shipping from 200 MT. Independent shipments from 2,500 MT.

WhatsApp

Choose your packaging

Bags or jumbos

Choose the format that suits your distribution and receiving setup.

CEM II/B-S 52.5 N, 42.5 kg bag42.5 kg

CEM II/B-S 52.5 N

45 bags per sling

42.5 kg bag

As low as US$7.95 / 42.5 kg bag

FOB Freeport, Bahamas · cement and bagging · under contract. Freight quoted separately.

The bagged pack for resale and site delivery.

CEM II/B-S 52.5 N, 1.5 MT jumbo bag1.5 MT

CEM II/B-S 52.5 N

Single-trip jumbo bag

1.5 MT FIBC

Quote only

A 1.5 MT jumbo bag. Confirm suitable unloading and handling equipment.

Shared Shipping
From 200 MT
Independent shipment
From 2,500 MT
42.5 kg bag packing
45 bags per sling
Shipment
Break-bulk ocean shipment
CEM II/B-S 52.5 N cement staged for port handling

How it ships

Plan your cement shipment.

Shared Shipping starts at 200 MT. Independent shipments start at 2,500 MT. Tell us the destination and timing you need so we can quote the arrangement.

Lab resultsDownload PDF

Cement-mortar strength

Strength results

Representative product results for CEM II/B-S 52.5 N
Test ageResultApprox. PSIReference / limitMethod
2 days24 MPa≈3,480 psi—EN 196-1
28 days59.5 MPa≈8,630 psi—EN 196-1

Complete reported profile

Setting and chemistry

setting, and physical properties

setting, and physical properties for CEM II/B-S 52.5 N
PropertyReported resultReference / limitMethod
Initial setting time137 min—EN 196-3
Final setting time200 min—EN 196-3
Soundness1.0 mm—EN 196-3
Specific surface · Blaine420 m²/kg—EN 196-6

Chemical analysis

Chemical analysis for CEM II/B-S 52.5 N
PropertyReported resultReference / limitMethod
Loss on ignition2.70 %—EN 196-2
Insoluble residue0.59 %—EN 196-2
Silicon dioxide · SiO₂22.87 %—EN 196-2
Aluminium oxide · Al₂O₃5.76 %—EN 196-2
Iron oxide · Fe₂O₃3.13 %—EN 196-2
Calcium oxide · CaO60.67 %—EN 196-2
Magnesium oxide · MgO2.12 %—EN 196-2
Sulfur trioxide · SO₃1.70 %—EN 196-2
Potassium oxide · K₂O0.64 %—EN 196-2
Sodium oxide · Na₂O0.13 %—EN 196-2
Chloride · Cl⁻0.013 %—EN 196-2

For batch-specific results, request your shipment’s mill test certificate (MTC) or certificate of analysis (COA).

Understand your options

A clear specification. A practical supply plan.

28-day cement-mortar test result: 59.5 MPa. B-S identifies the Portland-slag subtype. 52.5 is the EN strength class and N identifies normal early strength.

Request a quote

Let’s plan your cement supply.

Ask about CEM II/B-S 52.5 N for your destination. Choose Shared Shipping from 200 MT or an independent shipment from 2,500 MT.

How would you like to ship?

Share freight with other customers.

Shipment and contact details

We’ll use your details to prepare your quote. Privacy policy.