ViewingCEM III/B 52.5 N-SREN 52.5 N-SR / CEM III/B / 66.0% slag

CEM III/B 52.5 N-SR CBCM 42.5 kg cement bag

CEM III/B 52.5 N-SR EN 52.5 N-SR / CEM III/B / 66.0% slag

CEM III/B 52.5 N-SR

CEM III/B 52.5 N-SR with 66.0% reported slag. Its matched certificate reports 66.0% slag along with representative strength, setting, soundness, and chemistry results.

≈7,770 PSI28-day EN 196-1 result
42.5 kg bagAdd this format to the price request
1.5 MT FIBCAdd this format to the price request
Request pricing for CEM III/B 52.5 N-SR View product specifications
2 days≈3,310 PSI22.8 MPa
28 days≈7,770 PSI53.6 MPa
Full product specifications

What you’re buying

A complete CEM III/B identity, backed by matched certificate results.

CEM III/B identifies the blast-furnace cement subtype, and the matched certificate reports 66.0% slag.

52.5 is the EN strength class, N identifies normal early strength, and SR is the documented sulfate-resistant designation.

01

CEM III/B

The blast-furnace cement subtype.

02

66.0% slag

Reported in the matched certificate.

03

52.5 N

Strength class and normal early strength.

04

SR

The documented EN sulfate-resistant designation.

From specification to price

Build the price request around the 66.0% slag result.

Add the application, performance targets, requested documents, pack format, tonnage, timing, and destination port.

  • Full designation or project specification
  • Application, exposure, and performance target
  • Production schedule and strength timing
  • Requested certificates and inspection documents
  • Pack, tonnage, timing, and destination port
CEM III/B 52.5 N-SR cement at a clean concrete project site

Build the pricing brief

Build the price request around the product, project, and shipment.

Connect the exact cement to the production plan, pack format, tonnage, timing, and destination port.

01

Your specification

Share the standard, complete designation, application, exposure, and requested inspection documents.

02

Your production plan

Add the performance target, production schedule, mix requirements, placement, and curing plan.

03

Your shipment

Choose the pack, tonnage, timing, destination, receiving plan, and requested MTC or COA documents.

Bring the project mix and performance target into the enquiry so the cement and shipment can be priced against one complete commercial brief.

Representative EN 196-1 results

See the matched strength results at 2 and 28 days.

Representative cement-mortar results: ≈3,310 PSI at 2 days and ≈7,770 PSI at 28 days.

Representative EN 196-1 cement-mortar compressive-strength results
Test ageApprox. PSISource MPa
2 days≈3,310 PSI22.8
28 days≈7,770 PSI53.6

Representative physical results

The certificate details behind the product.

The certificate reports strength, setting, soundness, 45 µm retained material, slag content, and selected chemistry.

Selected representative test results
TestResult
Initial setting time125 min
Final setting time205 min
Soundness2.0 mm
45 µm retained5.3 %
Slag content66.0 %
Sulfur trioxide · SO₃2.05 %
Chloride · Cl⁻0.02 %
Loss on ignition3.45 %
View all specifications Download PDF Request pricing for CEM III/B 52.5 N-SR

The representative product results pair source MPa with rounded PSI for faster comparison. Add the EN 196-1 cement-mortar profile and project mix target to one complete pricing brief.

How you need it packed

Pick the format built for your operation.

Choose 42.5 kg bags or 1.5 MT FIBCs, then add the unloading plan, storage, tonnage, timing, and destination to build the shipment offer.

Pack format42.5 kg bagRequest pricing for 42.5 kg bagsPack format1.5 MT FIBCRequest pricing for 1.5 MT FIBCs
CEM III/B 52.5 N-SR 42.5 kg bag beside a 1.5 MT FIBC

Same CEM III/B 52.5 N-SR cement42.5 kg + 1.5 MT

Named-port pricing

FOB / CIF

quoted for your port and order

Price CEM III/B 52.5 N-SR for your port.

Send the pack, approximate tonnage, timing, and destination. The issued offer confirms origin, availability, freight scope, and lead time.

FOB and CIF: FOB puts ocean-freight control with your team from the named loading port. CIF adds ocean freight and minimum marine insurance to the named destination port. The issued offer itemizes the selected scope.

Request named-port pricing
CEM III/B 52.5 N-SR cement staged for port handling

FOB / CIF

Control the freight—or ask us to price it to your port.

Choose FOB when your team arranges ocean freight from the loading port. Choose CIF when you want the quote to include ocean freight and minimum marine insurance to the named destination port. The issued offer states the exact scope.

Request named-port pricing
CEM III/B 52.5 N-SR cement at a clean receiving site

Project and receiving details

Carry the complete CEM III/B designation into the shipment brief.

Add the application, requested documents, pack format, quantity, receiving plan, timing, and destination.

Request named-port pricing

Request named-port pricing

Build your price request around the real shipment.

Send the cement or specification, approximate tonnage, pack, timing, destination, and contact details. CBCM will connect those inputs in a focused FOB or CIF pricing scope.

Your company and contactCement and projectQuantity, pack, and timingDestination and FOB/CIF scope
01 Your company and contact
02 Cement and project
03 Shipment and port

Add an email or phone number for pricing follow-up.