Planning a concrete pour in hot, windy weather

A hot-weather pour needs planning for the concrete, crew and weather together. Air temperature alone does not describe the moisture-loss or handling conditions at the surface.

Look at the combination of conditions

Concrete temperature, wind, relative humidity and exposure to sun all matter. A windy site can present a moisture-loss problem even when the crew does not think the day feels exceptionally hot.

Fresh concrete is vulnerable when water leaves the surface faster than it is replenished. Consider the weather and mixture behavior together when planning protection.

Further detail: NRMCA CIP 12 — Hot-weather concreting; NRMCA CIP 5 — Plastic shrinkage cracking

Make the receiving operation ready

Arrange access, equipment and enough people to handle the planned delivery rate. Keep the placing and finishing sequence realistic. Delays caused by a blocked entrance, missing pump or unavailable crew should be resolved before the pour begins.

Discuss any mixture or scheduling adjustments with the producer in advance. Do not treat site water addition as the default answer to a delay.

Protect the surface and plan the follow-through

Have the agreed evaporation-control and curing materials ready before starting. The team should understand the difference between protection during placing/finishing and the final curing method.

Check conditions throughout the pour, even with a morning start. Record the weather, delivery sequence and curing arrangements so any cracking or unusual behavior can be investigated.

Common question

Is an early-morning pour automatically safe from drying problems?

No. Wind, humidity, concrete temperature and mixture behavior still need attention.