Setting, hardening and working time: why they are different
Setting, hardening and working time describe related but different stages. A laboratory setting-time number on a cement sheet is not a guaranteed placing deadline for every concrete mixture.

Setting is not the end of strength development
Fresh concrete begins as a workable mixture and then becomes less plastic. Strength develops as the cementitious system reacts. A material becoming stiff does not establish that it can support its intended structural load.
Rapid early-strength development describes strength gain, not the time available for placing and finishing.
Further detail: Irish Cement — Bulk CEM I
Working time belongs to the actual mixture and conditions
Temperature, elapsed time, constituent materials and admixtures can affect slump loss, setting and finishing behavior. A change in cement source or type can therefore matter even when the contractor uses familiar equipment.
Hot-weather planning should include delivery timing and the crew's ability to place and finish the concrete. Time lost waiting for access or equipment is a practical problem that a cement label cannot solve.
Further detail: NRMCA/ASCC — Fresh Concrete Expectations Checklist; NRMCA CIP 12 — Hot-weather concreting
Plan the sequence before placing
Confirm the mixture, delivery rate, access, placing method, consolidation, finishing and curing arrangements. Make sure the team knows whom to contact if the material behaves differently from what was agreed.
Record the conditions and any authorized adjustments. That makes a later question about setting or strength much easier to investigate than a description such as “it went off too fast.” When requesting cement, explain whether early strength or a particular production schedule matters, but retain the exact project specification as the purchasing basis.
Common question
Can I use the cement setting time as a truck-delivery deadline?
No. The concrete mixture and actual conditions need their own agreed planning and acceptance requirements.